Mechanical and Electrical contractors often juggle multiple projects with tight deadlines. In this article, we explore how manufacturers and suppliers to the M&E industry have adopted DfMA and modern methods of construction. We also discuss, whether or not adopting DfMA can help M&E contractors deliver projects on time.
We provide an overview of:
Modern Methods of Construction (MMC) can be defined as a wide term, embracing a range of offsite manufacturing and onsite techniques that provide alternatives, such as modular housing to traditional house building (NHBC Foundation, 2016)
Modular housing became popular after the Second World War when there was a need to quickly construct buildings, especially residential housing to replace damaged buildings. (Design Buildings, 2016). As time moved on, more efficient and cost-effective methods of construction surfaced, in part, to meet the growing housing demands. At the centre of the modern methods of construction is the concept of Design for Manufacturing Assembly (DfMA).
DfMA is defined as: “a common design approach which focuses on the simplicity of manufacture and the efficiency of assembly” (Designing Buildings, 2020) The principles surrounding DFMA have become widely adopted in the construction industry enabling the efficient and safe building of homes and businesses.
DfMA encourages the collaboration between design, engineering and manufacturing to create a lean production method, reducing waste and cost.
The main principles of DfMA are:
Over the 1970’s and 1980’s Geoffrey Boothroyd, an industrial engineer, and his team researched ways to provide designers with tools to improve efficiencies in the automatic and manual assembly of products in factories. The team created two pieces of software to meet this aim:
Both General Motors and Ford claimed to have utilised both, improving production efficiencies across their production lines. Both pieces of software were publicized into a book ‘Product Design for Manufacture and Assembly’ and so the term DfMA was born (Boothroyd, 1983).
For principle contractors their main aim for every project is to:
In order to achieve this aim, suppliers and manufacturers must incorporate modern design and production techniques. One common design approach is BIM.
According to ISO 19650:2019 BIM can be described as the “use of shared digital representation of a built asset to facilitate design, construction and operation processes to form a reliable basis for decisions”.
MIDFIX utilise BIM to manage multiple streams of information from all of the stakeholders involved within construction project to ensure there is no conflict on-site between different teams.
Another way of reducing the waste of materials and reducing on-site installation time is through off-site manufacturing.
Off-site manufacturing reduces project time, labour costs and headcount on site along with mitigating risk and waste. Other benefits include:
M&E contractors often juggle multiple project deadlines with tight deadlines come across several obstacles stopping them from completing projects on time.
Obstacles include:
MIDFIX are experts in onsite and offsite supports for the mechanical and electrical industries, delivered through design, engineering, fabrication and industry training. By employing DFMA principles and having a ‘right, first-time’ approach we can help M&E contractors complete projects on time, within budget reducing the risk of any on-site issues.
MIDFIX can reduce the risk of on-site stock issues with over 16,000 product lines available in stock and ready for next day dispatch. We save a considerable amount of time and wastage on-site, simply by having materials supplied that are cut to size.
MIDFIX minimises the chances of missing project deadlines by designing and engineering bracket supports to support cable, pipework & rooftop services, all of which arrive on-site pre-assembled ready for quick assembly.
The MIDFIX Academy is the only specialist training and technical resource to upskill and support installers and supervisors in the M&E sector. The MIDFIX Academy offers supervisor and installer training to ensure anchor installation is BS 8539 compliant.
MIDFIX adopt the principles of DfMA by utilising our in-house prefabrication facility to support our clients through manufacturing off-site to build modules and supports.